ULTRA-CUT 400 XT

Manual 0-5306

INSTALLATION

3-45

3.25 Complete the Installation

1. Remove the cap from the coolant tank. Fill the coolant tank to the level shown, with Thermal Dynamics coolant. The

coolant level is visible through the translucent coolant tank. The amount of coolant required varies with torch leads length.

Coolant Capabilities

Cat. Number and Mixture

Mixture

Protects To

7-3580 ‘Extra-CoolTM’

25 / 75

10° F / -12° C

7-3581 ‘Ultra-CoolTM’

50 / 50

27° F / -33° C

7-3582 ‘Extreme CoolTM’

Concentrate*

-65° F / -51° C

* For mixing with D-I CoolTM 7-3583

Art # A-11536

Fill Range

Coolant Tank

2. After the complete system has been installed, check that the coolant has been pumped through the system as follows

(see NOTE):

NOTE

Depending on the length of the torch leads, the system may require more coolant after turning the system

ON for the first time.