Figure 2.2, Lifting lug location, Installation – AERCO KC1000 Boiler July 2011 User Manual

Page 12

Advertising
background image

INSTALLATION

2-2

2.3 INSTALLATION

The unit must be installed with the prescribed

clearances for service as shown in Figure 2.1.

The minimum clearance dimensions, required by

AERCO, are listed below. Local building codes

may require more clearance and take

precedence

Minimum clearances required:
Sides

24"

Front

18"

Rear

18"

Top

18"

All gas piping, water piping, and electrical

conduit or cable must be arranged so that they

do not interfere with the removal of any cover, or

inhibit service or maintenance of the unit.

WARNING!

KEEP UNIT AREA CLEAR AND FREE

FROM COMBUSTIBLE MATERIALS AND

FLAMMABLE VAPORS AND LIQUIDS

.

2.3.1. SETTING THE UNIT

Remove the unit from the wooden skid and

place in position using a block and tackle or

hoist attached to the lifting lugs, (see Figure

2.2). USE ONLY THE LIFTING LUGS TO

MOVE THE UNIT.

The KC-1000 is U/L approved for installation on

combustible flooring. A 4” to 6" high house-

keeping concrete pad is recommended and

allows for sufficient drainage of the condensate.

It is suggested that units be secured using the

holes provided in the frame base. Piping must

not be used to secure the unit in place. See

drawing AP-A-568 in Appendix F for the base

frame dimensions.

In multiple unit installations, it is important to

plan the position of each unit. Sufficient space

for piping connections and future maintenance

requirements must be given. All piping must

include ample provision for expansion

.

If installing a Combination Control (CCP)

system, it is important to identify and place the

Combination Mode units in the proper physical

location.

LIFTING LUGS

Figure 2.2

Lifting Lug Location

2.3.2 SUPPLY AND RETURN PIPING

The locations of the 4" flanged system supply,

and return piping connections, to the unit are

shown in Figure 2.3. The return connection is

located on the left side near the base of the

unit’s shell. The supply connection is located on

the left side near the top of the unit’s shell.

Whether installing single or multiple units, install

the piping and accessories as shown in the

appropriate piping diagram located in the

Appendix G. For applications other than stan-

dard space heating, consult the AERCO Boiler

Application Guide, GF-1070, or AERCO for the

appropriate piping schematics.

The minimum flow rate through the unit is 25

GPM and the maximum flow rate is 150 GPM.

Each unit is fitted with 4" flanges for high flow

application and the system velocity at the unit

return should not exceed 5 feet per second.

Each unit must have individual valves on the

supply, and return, for maintenance. In multiple

unit installations, the flow through each unit must

be balanced.

MASSACHUSETTS INSTALLATIONS

For boiler installations within the

Commonwealth of Massachusetts, the

boiler must be installed by a plumber or

gas fitter who is licensed within the

Commonwealth. In addition, the boiler

installation must comply with all

requirements specified in Section 1

(Safety Precautions), pages 1-2 and 1-3.