Control panel operating procedures – AERCO KC1000 Boiler July 2011 User Manual

Page 32

Advertising
background image

CONTROL PANEL OPERATING PROCEDURES

3-10


Table 3-6.

Relationship Between Air/Fuel Valve Position and Energy Input of a Unit Running on Natural Gas

Valve position,

Air/Fuel Valve

Position

(% Open)

Energy Input

(BTU/Hr)

Boiler Energy Input

(% of Full Capacity)

0

0

0

10

0

0

13

(Stop Level)

50,000

5 %

20

89,000

9%

30

191,000

19%

40

311.000

31%

50

460,000

46%

60

600,000

60%

70

699,000

70%

80

836,000

84%

90

955,000

96%

100

1,000,000

100%

Advertising