r3

-50.0

99.0

°C/°F (1)

3.0

3.0

temperature-controlled blast chilling end time

temperature; also end temperature of the

temperature-controlled soft deep freezing

phase (temperature detected by the needle

probe); also see parameter r5

r4

-50.0

99.0

°C/°F (1)

-18.0

-18.0

temperature-controlled deep freezing end

temperature (temperature detected by the

needle probe); also see parameter r6

r5

1

500

min

90

90

maximum duration of temperature-controlled

blast chilling; also see parameter r3

r6

1

500

min

240

240

maximum duration of temperature-controlled

deep freezing; see parameter r4 also

r7

-50.0

99.0

°C/°F (1)

0.0

0.0

work set-point during blast chilling; also work

set-point during the soft deep freezing phase

(cabinet temperature); also see parameter r0

r8

-50.0

99.0

°C/°F (1)

-40.0

-40.0

work set-point during deep freezing (cabinet

temperature); also see parameter r0

r9

-50.0

99.0

°C/°F (1)

-20.0

-20.0

work set-point during blast chilling hard

phase

(cabinet

temperature);

also

see

parameter r0

r10

-50.0

99.0

°C/°F (1)

2.0

2.0

work set-point during post blast chilling

storage (cabinet temperature); also see

parameter r0

r11

-50.0

99.0

°C/°F (1)

-20.0

-20.0

work set-point during post deep freezing

storage (cabinet temperature); also see

parameter r0

r12

-50.0

99.0

°C/°F (1)

5.0

5.0

work set-point during pre-cooling (cabinet

temperature); also see parameter r0

r13

-50.0

99.0

°C/°F (1)

15.0

15.0

end

temperature

of

the

temperature-

controlled

hard

blast

chilling

phase

(temperature detected by the needle probe)

Advertising
This manual is related to the following products: