EVCO EVXV815P7 Installer manual User Manual

Page 36

Advertising
background image

EVCO S.p.A.

EVXV 800 range | Installer manual ver. 1.2 | Code 144XV800E124

page 36 of 66

r14

10

100

%

60

60

duration of the time-controlled hard blast

chilling phase (intended as a percentage of

the value established with parameter r1);

also duration of the time-controlled soft deep

freezing phase (intended as a percentage of

the value established with parameter r2)

r15

-50.0

99.0

°C/°F (1)

65.0

65.0

temperature below which the count of the

maximum

temperature-controlled

blast

chilling and maximum temperature-controlled

deep

freezing

is

started

(temperature

detected by the needle probe)

r16

0

2

- - - -

1

1

type of operating cycle that can be selected

0 = blast chilling and storage

1 = blast chilling and storage or deep

freezing and storage

2 = deep freezing and storage

r17

0.0

99.0

°C/°F (1)

5.0

5.0

"temperature detected by the needle probe -

cabinet temperature" minimum difference

such to consider the first phase of the test to

verify correct insertion of the needle probe

completed

successfully

(consider

the

difference without sign)

0.0 = the test will not be performed (neither

first or second phase)

r18

1

99

s

60

60

duration of the second phase of the test for

verification of correct insertion of the needle

probe

r19

0

1

- - - -

0

0

quick modification value during the "On"

status before starting the operating cycle

0 = work set-point during blast chilling or

during deep freezing

1 = blast chilling or deep freezing end

temperature

Advertising
This manual is related to the following products: