Job tooling settings, Job miscellaneous settings, Job notes – LINK Systems LinkNet II User Manual

Page 56: Figure 4.37: jog configuration tooling dialog box

Advertising
background image

4.13.1.3 Job Tooling Settings

The “Tooling” settings page

(see Figure 4.37) specifies the
tooling to be used with the job.
As can be seen in the figure, up
to four tools can be configured
for each job.

Hit the small down arrow at

the right of the “Tool 1” field to
drop down a listing of all
configured tools and select the
appropriate tool. Repeat this
process as needed for additional
tools in fields “Tool 2”, “Tool
3”, and “Tool 4”. Leave the tool
fields as “Not Specified” when
no tool is used. In the example
at right, a single tool “TOOL-
0001” is configured for the job.

The standard setup time and

standard removal time can be set
for the job. Note that clicking
the “Set Times Based On Tools” button will add up the standard setup and removal times configured for
each tool in tool configuration and set the fields in this dialog box accordingly. These values, however,
may be overridden.

Figure 4.37: Jog Configuration Tooling Dialog Box

NOTE: It is absolutely critical that the proper tools be associated with the job in order
for tool preventive maintenance to work. PM info will always work for machine, but will
work for tools only where tools have been associated with a job.


4.13.1.4 Job Miscellaneous Settings

The “Miscellaneous” settings page contains customer fields for the job. LinkNet does not directly

use the customer fields. These three fields are provided for custom uses by, of course, the customer.


4.13.1.5 Job

Notes

The “Notes” settings page provides a space for job notes. Like machine notes, these notes can be

viewed at the operator terminal on the machine.





Manual Version 1.1

10/28/2001

4.34

Advertising