Report shifts selection, Figure 6.2, Report shift selection dialog box – LINK Systems LinkNet II User Manual

Page 70

Advertising
background image

explanation of the time types. Each report has a default selection for the time types that typically works
best for that report.

To select a custom time period, use the “From” and “To” fields under the “Select a Custom Time

Period …” section to specify a start and end date. Then hit the “Use Selected Times” button to proceed
to the next step in report generation.

To use a standard time period, simply click the appropriate button at the bottom section of the dialog

box. These buttons are labeled


6.1.2 Report Shifts Selection

Many reports allow the selection of the shift or shifts for which they are to be run. For instance, a

report could be run to report only on shift 2. The dialog box that will appear for these reports should be
similar to Figure 6.2.

Figure 6.2: Report Shift Selection Dialog Box

By default, all shifts except shift 0 will be included. Shift 0 is off-schedule time. The left list box

shows shifts that are not included in the report. The right side shows shifts that are included in the
report. Select a shift from the left list box and hit the “Add” button to move it to the right list box or hit
the “Add All” button to include all shifts in the report. Similarly, select a shift from the right hand list
and hit the “Remove” button to transfer it to the left hand list box or hit the “Remove All” button to
remove all shifts from the report. When the shifts are selected as desired, hit the “OK” button to
proceed or the “Cancel” button to cancel the report.










Manual Version 1.1

10/28/2001

6.2

Advertising