Adding a preventive maintenance item – LINK Systems LinkNet II User Manual

Page 60

Advertising
background image

4.15.1 Adding a Preventive Maintenance Item

To add a PM item, hit the “Add PM Item” button and the dialog from the PM listing dialog of a

machine or tool (see Figure 4.39 and Figure 4.40) and a dialog box similar to Figure 4.41 should be
displayed. Note that this dialog box is identical for machines and tools.

Figure 4.41: Preventive Maintenance Configuration Dialog Box



The settings on this dialog box are as follows:

PM Item Name: Enter the description for this PM item. This could be “Bearing Check”, “Clutch/Brake
Wear Check”, “Press Stopping Time Check”, etc. This description will appear in the PM listing and in
PM reports.





Manual Version 1.1

10/28/2001

4.38

Advertising