Page  4

Section 6 – Process Control Settings

Dukane Manual Part No. 403-574-01

1. Press CANCEL until you see the Main Menu screen as

it is shown here.

Move the selection indicator to PROCESS SETUP.

2. Press ENTER and you will see the screen as shown

here.

3. Select PROCESS CONTROL, and press ENTER.

With no option boards installed in the generator, you
will get a WELD BY choice of iQ SYSTEM or

AUTOMATION.

4. Select AUTOMATION.

# 1:
OPERATE MODE
PROCESS SETUP
HARDWARE SETUP

PROCESS SETUP
PROCESS CONTROL
PROCESS LIMITS
UTILITIES

AUTOMATED PROBE
WELD CONTROL BY
iQ SYSTEM
AUTOMATION

HOW TO - Have a PLC Control the Ultrasound Activation

Programming the Generator - Some Examples

On the following pages these programming examples cover how to:

• Have a PLC Control the Ultrasound Activation

• Weld by Time

• Weld by Energy

• Adjust Amplitude

• Adjust Ramp Up Time (Soft Start)

• Adjust Ramp Down Time (Soft Stop)

NOTE

Once a primary weld method has been selected (Time, Energy, Peak Power), pressing
the INFO key takes you to a “Hot Key” screen. There you can quickly move to the weld
method’s frequently used programming areas.