Mpc cycle illustration – Dukane ULTRASONIC GENERATOR/POWER SUPPLY LS 403-574-01 User Manual

Page 87

Advertising
background image

Page  1

Section 10 - Options

Dukane Manual Part No. 403-574-01

Confirm probes

are retracted

from weld

position.

Load part to be

welded.

Move part to the

welding position.

Move probes to

the welding

position.

MPC Ready

Status Output

active?

PLC activates

generator’s binary

code inputs to select

active probe.

Wait 40 mS to

confirm binary code

has been received

by generator.

PLC activates

generator’s automation

start input.

Generator’s MPC

Ready Status

Output deactivates.

Generator processes

the weld according to

its hardware and

software settings.

Generator Ready

Status Output

active?

No

Yes

PLC monitors all

other generator status

output features.

Have all probes

processed a weld?

No

Yes

Remove welded part.

Move probes to part

loading position.

No

Yes

MPC Cycle Illustration

The flow chart below illustrates a typical welding
cycle when the MPC feature is used.

Figure 10-10

MPC Cycle Flow Chart

Advertising