USER INSTRUCTIONS MARK 3 High Silicon Iron ENGLISH 71569249 09-04

®

j)

Grout the baseplate. A non-shrinking grout
should be used. Make sure that the grout fills the
area under the baseplate. After the grout has
cured, check for voids and repair them.
Jackscrews, shims and wedges should be
removed from under the baseplate at this time. If
they were to be left in place, they could rust,
swell, and cause distortion in the baseplate.

k) Run piping to the suction and discharge of the

pump. There should be no piping loads
transmitted to the pump after connection is made.
Recheck the alignment to verify that there are no
significant loads.

4.5 Initial alignment


4.5.1 Horizontal initial alignment procedure
The purpose of factory alignment is to ensure that the
user will have full utilization of the clearance in the
motor holes for final job-site alignment. To achieve
this, the factory alignment procedure specifies that
the pump be aligned in the horizontal plane to the
motor, with the motor foot bolts centered in the motor
holes. This procedure ensures that there is sufficient
clearance in the motor holes for the customer to field
align the motor to the pump, to zero tolerance. This
philosophy requires that the customer be able to
place the base in the same condition as the factory.
Thus the factory alignment will be done with the base
sitting in an unrestrained condition on a flat and level
surface. This standard also emphasizes the need to
ensure the shaft spacing is adequate to accept the
specified coupling spacer.

The factory alignment procedure is summarized
below:
a) The baseplate is placed on a flat and level

workbench in a free and unstressed position.

b) The baseplate is leveled as necessary. Leveling

is accomplished by placing shims under the rails
of the base at the appropriate anchor bolt hole
locations. Levelness is checked in both the
longitudinal and lateral directions.

c) The motor and appropriate motor mounting

hardware is placed on the baseplate and the
motor is checked for any planar soft-foot
condition. If any is present it is eliminated by
shimming.

d) The motor feet holes are centered on the motor

mounting fasteners. This is done by using a
centering nut as shown in figure 4-6.

e) The motor is fastened in place by tightening the

nuts on two diagonal motor mounting studs.

f) The pump is put onto the baseplate and leveled.

The foot piece under the bearing housing is
adjustable. It is used to level the pump, if necessary.

Mark 3A and ANSI 3A design
If an adjustment is necessary, add or remove
shims [109A] between the foot piece and the
bearing housing.
Mark 3 design (old)
If an adjustment is necessary, the adjuster nut
[6570.4B] is used to move the footpiece up or
down.


Figure 4-6

g) The spacer coupling gap is verified.
h) The parallel and angular vertical alignment is

made by shimming under the motor.

i)

The motor feet holes are again centered on the
motor mounting studs using the centering nut. At
this point the centering nut is removed and
replaced with a standard nut. This gives
maximum potential mobility for the motor to be
horizontally moved during final, field alignment.
All four motor feet are tightened down.

j)

The pump and motor shafts are then aligned
horizontally, both parallel and angular, by moving
the pump to the fixed motor. The pump feet are
tightened down.

k) Both horizontal and vertical alignment is again

final checked as is the coupling spacer gap.

See section 4.8, Final shaft alignment.

4.6 Piping

Protective covers are fitted to both the

suction and discharge flanges of the casing and must
be removed prior to connecting the pump to any pipes.

4.6.1 Suction and discharge piping
All piping must be independently supported, accurately
aligned and preferably connected to the pump by a
short length of flexible piping. The pump should not
have to support the weight of the pipe or compensate
for misalignment. It should be possible to install suction
and discharge bolts through mating flanges without
pulling or prying either of the flanges. All piping must be
tight. Pumps may air-bind if air is allowed to leak into
the piping. If the pump flange(s) have tapped holes,
select flange fasteners with thread engagement at least