Torch setup 2-10 duramax retrofit torch – Hypertherm HRT User Manual

Page 28

Advertising
background image

Torch seTup

2-10

Duramax Retrofit Torch

Operator Manual

7. Disconnect the wire connector for the cap‑sensor switch.
8. Use a #2 Phillips screwdriver to remove the screw that secures the torch’s pilot wire to the

torch body.

9. Use 1/4‑inch and 3/8‑inch wrenches, or adjustable wrenches, to loosen the nut that secures

the gas supply line to the torch lead. Set the torch body aside.

Note:

Cover the end of the gas line on the torch lead with tape to keep dirt and other

contaminants from getting in the gas line when you route the lead through the track.

10. Slide the coupler, positioning sleeve (full‑length machine torch), strain relief nut, and strain

relief body off the front of the torch lead.

11. If you do not need the gear rack on a full‑length machine torch, slide the gear rack from the

positioning sleeve toward the consumables end of the sleeve.

12. Route the torch lead through the cutting table’s track.

Gas supply line

connection

Torch head

Pilot wire terminal screw

Wire connector for

cap‑sensor switch

Advertising
This manual is related to the following products: