Hypertherm HRT User Manual

Page 29

Advertising
background image

TORCH SETUP

Duramax Retrofit Torch

Operator Manual

2-11

13. Slide the strain relief body and strain relief nut over the torch lead.
14. If you are mounting a full‑length machine torch, slide the positioning sleeve over the torch

head.

15. Slide the coupler over the torch lead.
16. Reconnect the gas line to the torch lead.
17. Reattach the torch’s pilot wire to the torch body using the screw.
18. Reconnect the cap‑sensor switch’s wire connector.
19. Slide the mounting sleeve over the front of the torch body. Align the slot on the front of the

mounting sleeve (next to one of the three screw holes) with the cap‑sensor plunger on the

torch body.

20. Attach the mounting sleeve to the torch body using the three screws.
21. Screw the coupler into the mounting sleeve.
22. If you are mounting a full‑length machine torch, screw the positioning sleeve into the coupler.
23. Reconnect the strain relief nut and strain relief body.
24. Attach the torch to the lifter per the manufacturer’s instructions.

Advertising
This manual is related to the following products: