Datalogic Scanning DS6400 User Manual

Page 85

Advertising
background image

READING FEATURES

4

By selecting the “PackTrack Calibration” option a further dialog box appears allowing to start
calibration:

Position 1

Position 2

Position 3

Figure 82 – Performing the PackTrack™ Calibration

1. Place the code at the desired position on the scan line (i.e. Position 1)

2. Measure the X, Y and Z coordinates relative to the center of the code and enter them into

the corresponding edit boxes.

3. Press the Calibrate button for Position 1 to start the calibration.

4. Repeat the same procedure for Position 2 and Position 3.

5. Press the “Validate Calibration” button to validate the calibration settings.

Before closing the dialog box, press the Run Test button to test the calibration results and
efficiency.

NOTE

cessary. For

these cases set x = 0, z= 0 during the calibration procedure.

In the vast majority of systems the x and z data are not ne


69

Advertising