SMA SB 1.5-1VL-40 User Manual

Page 24

Advertising
background image

• If the external diameter of the cable is

between 5 mm and 7 mm, thread the cable
through the cable gland directly.

• If the external diameter of the cable is

between 8 mm and 13 mm, first remove the
inner sealing ring from the cable gland and
then thread the cable through the cable
gland. When doing so, ensure that the
outer sealing ring is positioned correctly in
the cable gland.

3

4

2

1

5. Dismantle 70 mm of the AC cable.
6. Shorten both L and N by 5 mm respectively, in order that the grounding conductor is the last

to become detached in the event of tension.

7. Strip 15 mm of the insulation of L, N and the grounding conductor.
8. Connect L, N and the grounding conductor to

the connecting terminal plate of the supplied AC
plug in accordance with the labeling. When
doing so, ensure that the conductors are
plugged completely into the terminal up to the
insulation.
Tip: To detach the conductors, plug a flat-blade
screwdriver (blade width: 3 mm) into the
rectangular openings positioned behind them.

9. Make sure that all conductors are securely in place.

6 Electrical Connection

SMA Solar Technology AG

Operating Manual

SB15-25-BE-en-10

24

Advertising
This manual is related to the following products: