SMA SB 1.5-1VL-40 User Manual

Page 4

Advertising
background image

6.5.4

Disassembling the DC Connectors................................................ 31

7

Commissioning the Inverter ..................................................... 33

8

Using the Inverter User Interface ............................................ 34

8.1

Calling Up the Inverter User Interface .............................................. 34

8.1.1

Calling Up the Inverter User Interface via Direct Connection ..... 34

8.1.2

Calling Up the Inverter User Interface in the Local Network ...... 36

8.2

Design of the Inverter User Interface ................................................ 37

8.3

Changing the Password..................................................................... 39

8.4

Forgotten Password............................................................................ 40

9

Configuration ............................................................................ 41

9.1

Configuration Procedure.................................................................... 41

9.2

Starting the Installation Assistant ....................................................... 41

9.3

Starting the Self-Test (For Italy Only) ................................................ 42

9.4

Activating the Receipt of Control Signals (Only for Italy)................ 42

9.5

Deactivating Grounding Conductor Monitoring.............................. 43

9.6

Setting SMA OptiTrac Global Peak ................................................. 43

9.7

Saving the Configuration in a File..................................................... 44

9.8

Adopting a Configuration from a File............................................... 44

9.9

Updating the Firmware ...................................................................... 44

9.10 Integrating the Inverter into the Network.......................................... 45
9.11 Setting the Date and Device Time..................................................... 45
9.12 Configuring the Energy Meter........................................................... 45
9.13 Configuring Feed-In Management.................................................... 46
9.14 Changing Operating Parameters...................................................... 46
9.15 Configuring the Country Data Set..................................................... 47
9.16 Switching the Dynamic Power Display Off....................................... 48
9.17 Switching WLAN Off ......................................................................... 48
9.18 Switching WLAN On ......................................................................... 48

10 Disconnecting the Inverter from Voltage Sources.................. 50

11 Technical Data........................................................................... 52

12 Contact....................................................................................... 57

Table of Contents

SMA Solar Technology AG

Operating Manual

SB15-25-BE-en-10

4

Advertising
This manual is related to the following products: