5 deactivating grounding conductor monitoring, 6 setting sma optitrac global peak, Deactivating grounding conductor monitoring – SMA SB 1.5-1VL-40 User Manual

Page 43: Setting sma optitrac global peak

Advertising
background image

The basic procedure for changing operating parameters is explained in another section (see
Section 9.14 "Changing Operating Parameters", page 46).

Parameter

Value/range

Resolution

Default

Application ID

0 … 16384

1

16384

GOOSE-Mac address 01:0C:CD:01:00:00


01:0C:CD:01:02:00

1

01:0C:CD:01:00:00

Procedure:

1. Select the parameter group External Communication > IEC 61850 configuration.
2. In the field Application ID, enter the application ID of the grid operator gateway. You will

receive this value from your grid operator. You can enter a value between 0 and 16384. The
value 16384 indicates "deactivated".

3. In the field GOOSE-Mac address, enter the MAC address of the grid operator gateway from

which the inverter is to receive the control commands. You will receive this value from your grid
operator.

☑ The receipt of control signals from the grid operator is activated.

9.5

Deactivating Grounding Conductor Monitoring

If the inverter is to be installed in an IT network or another grid configuration in which deactivation
of the grounding conductor monitoring is required, deactivate the grounding conductor monitoring
as follows.
The basic procedure for changing operating parameters is explained in another section (see
Section 9.14 "Changing Operating Parameters", page 46).

Procedure:

• Set the parameter PE connection monitoring to Off.

9.6

Setting SMA OptiTrac Global Peak

For partially shaded PV modules, you should set the interval at which the inverter is to optimize the
MPP of the PV system.
The basic procedure for changing operating parameters is explained in another section (see
Section 9.14 "Changing Operating Parameters", page 46).

Procedure:

• Select the parameter Cycle time of the OptiTrac Global Peak algorithm or

MPPShdw.CycTms and set the required time interval. The ideal time interval is usually six
minutes. This value should only be increased if the shading situation changes extremely slowly.

☑ The inverter optimizes the MPP of the PV system at the predetermined time interval.

9 Configuration

SMA Solar Technology AG

Operating Manual

43

SB15-25-BE-en-10

Advertising
This manual is related to the following products: