SMA Solar Technology AG

Internal Electrical Connections

Installation Guide

SCxxxHE-IEN104432

39

Procedure for power cabling:

1. First connect the lower power unit followed by the middle unit and then the upper unit.

2. Affix the 3 power cables of the respective external conductor to the stabilizer bars using cable

ties.

3. Feed the power cables through the opening in the side wall above the cabinet plate and feed

back in at the area of the AC cabinet.

4. Use cable ties to bind the power cables to the plates of the switch cabinet.
5. Connect the 3 power cables of the respective external conductor to the sine-wave filter.

NOTICE!
Warming of the Sunny Central due to cable routing near the internal fans.

• In the left cabinet system, lay the power cables to the left and right of the three

internal fans in order to avoid affecting their function.