6 external connections, External connections – SMA SC 400HE Installation User Manual

Page 49

Advertising
background image

SMA Solar Technology AG

External Connections

Installation Guide

SCxxxHE-IEN104432

49

6 External Connections

The following connections have to be made in order to connect the Sunny Central externally:

• AC grid connection
• PE rail connection
• AC control voltage
• DC connection
• External messages and signals
• Sensors and digital outputs
• Communication connector
• Emergency stop cabling
• Lightning and overvoltage protection

Installing the external connections
Adhere to the circuit diagram included in the delivery when realizing external connections.

Dimensioning the connections
The implementation of the AC grid connection point as well as the maximum inverter-
specific connection cross-section and terminal lugs are included in the Installation
Requirements of the relevant Sunny Central.

Advertising