Connection Sequence for AC Connection

NOTICE!
Operational reduction of the Sunny Central due to faulty connection!

When connecting the power cables, the following connection sequence must be observed:

1. Screw
2. Spring washer
3. Washer
4. Terminal lug
5. Copper-clad aluminum washer
6. Connection point for copper bar

• Copper-clad aluminum washer, if

required

• Terminal lug, if required

7. Washer
8. Spring washer
9. Nut