SMA SC 400HE Installation User Manual

Page 43

Advertising
background image

SMA Solar Technology AG

Internal Electrical Connections

Installation Guide

SCxxxHE-IEN104432

43

Example PE connection between the switch cabinets of the Sunny Central

Check the grounding connection
When connecting the grounding connection, make sure that the screws are securely
positioned.

Position of the PE rail
Due to the design, the exact position of the PE rail is next to the fuse strip in the DC cabinet
and behind the sinusoidal filter in the AC cabinet. The exact position of the PE rail can be
determined with the help of the equipment identifier and the provided circuit diagram.

L-

L+

L-

L+

L-

L+

M3-810

M3-810

M3-810

L+

L-

PE

Advertising
This manual is related to the following products: