External Connections

SMA Solar Technology AG

54

SCxxxHE-IEN104432

Installation Guide

Model 13/2
In this case, the connection is made to three U-shaped
copper bars.

Model 13/3
In this case, the connection is made to three U-shaped
copper bars.
The particularity of this connection is the so-called side
outlet; here the AC cabling is fed downward directly along
the side of the Sunny Central.

Model 13/4
In this case, the connection is made to three copper bars,
each of which is angled differently. Seen from the front, the
first will not be angled, and the second and third will be
angled at 15 ° and 30 °, respectively.
These models are only offered for left-handed switch
cabinets.

Model 13/5
In this case, the connection is made to three U-shaped
copper bars.
The particularity of of this connection is the separated
copper bars.

Diverse installation models
Depending on the specific model, the different copper bars or insulators as well as other
add-on parts included in the accessories must be installed.