Figure 6‐6. terminal block bracket – Powerware 9315 User Manual

Page 46

Advertising
background image

INSTALLING OPTIONAL ACCESSORIES

EATON Powerware

®

9315 UPS (500–750 kVA) Installation and Operation Manual

S 164201244 Rev E www.powerware.com

6-8

Connect to

Port 1 (DB‐9) on

Customer Interface Panel

Fuse

Terminal
Block
(TB3)

Figure 6‐6. Terminal Block Bracket

6.

Connect the SCM wiring to the terminal block using the terminations shown in
Table 6‐4.

Table 6‐4. SCM Wire Terminations

From SCM A

To UPS

Remarks

TB1‐4

TB3‐1

Twisted wires (4)

1–2 turns per 3”

TB1‐5

TB3‐2

TB1‐6

TB3‐3

TB1‐7

TB3‐4

From SCM B (If Used)

To UPS

Remarks

TB1‐4

TB3‐5

Twisted wires (4)

1–2 turns per 3”

TB1‐5

TB3‐6

TB1‐6

TB3‐7

TB1‐7

TB3‐8

7.

Contact your Eaton service representative for verification and testing of the SCM
and its connections prior to making connections to terminal strip TB2 shown in
Figure 6‐7.

8.

Repeat Steps 1 through 7 if you are installing another SCM.

9.

Secure the access plate on top of the UPS Input/Rectifier cabinet.

Advertising