8-1



The 4100U-S1 is tested in the factory and is loaded with a basic configuration.

When the panel arrives on site the installer must unpack and check the panel, mount the
cabinet, any additional cards, and check the configuration before applying power.

A registered electrician must connect the mains. The panel should then be powered up
and checked for correct operation.

With the mains turned off and the batteries disconnected, the field wiring is checked and
connected to the field terminals on the various cards.

The panel should then be powered up and re-programmed to accommodate all the
connected field devices. Faults in the field wiring, misaddressed detectors / devices and
mismatched detectors / devices will be displayed on the LCD. These should be cleared
one at a time and then the system (panel plus connected devices) should be
commissioned.

Refer to the page number listed in this table for information on a specific topic.

Topic

See Page #

Alignment & Adjustment

8-2

Power Up & Placing into Operation

8-3

Maintenance

8-4


Chapter 8

Installation Checklist, Commissioning & Maintenance

Introduction

In this Chapter