Galaxy gateway, Operational note, Preparation – GE Industrial Solutions Galaxy Vector Rack Mounted Controller J85501M-1 User Manual

Page 75: A - 5, Figure a-4: installing the gateway, Hd r1 h d r2, Red/ rojo blk /ne gro

Advertising
background image

Galaxy Rack-Mounted Vector Controller J85501M-1

Issue 2 January 2008

Communications Appendix A - 5

Galaxy Gateway

Figure A-2 shows the Galaxy Gateway installation and cabling
procedures required in a J85501M-1 Vector controller, including
computer and Galaxy Gateway configuration. Note that only one
mounting position is available for a remote option; either a
Gateway (EBW) or modem (BSM) board.

Operational Note

If J5 is connected to an option board (EBV1, BSM3 or BSM4),
then a terminal is connected to DB9 connector J4, the J4 RS-232
connection takes precedence. This will stop the RS-232
communication through J5 until the connection to J4 is removed.

Figure A-4: Installing the Gateway

EBW1 Gateway Board

BUJ Board

Alarm Termination Board

HDR3

H

D

R1

H

D

R2

J4

S1

FH1

P2

J6

J9

P5

J5

-

+

-

+

J1
3

J1
4

1

J21

1

J15

1

1

1

J19

1

J18

J20

J1
7

J1
6

BU

Z1

J7

J8

J3

J1

2

2

8

1

1

8

A1

B1

C1

A32

C32

1

1

1

1

1

1

2

3

4

5

6

7

8

1

0

TERM

RES

RS

48
5

POW

E

R

OPT RS232

11
/3

A

AB
S

FU
SE

AMJ

FAJ

LVD1

LVD2

THERM 2

THERM 1

FORCE ON

AUTO

FORCE ON

24V

48V

48V

24V

24V

48V

24V

48V

ON

OFF

LO
CA

L RS

23
2

KEY PAD

DISPLAY

R10

TJ
2

TJ1

RED/

ROJO

BLK

/NE

GRO

PLANT V

SHUNT

848575841 Controller
Interface Cable

848722096
BUJ Power Cable

CAT5 LAN
Cable

848575841
EBW Power
Cable*

J5

P1

P5

TB2*

Red

TB4*

Red: ABS - TB4 Pin 1,3,5,9 or 11
Black: DG - TB2 Pin 11 or 12

*Power Cable Connections

Black

Preparation

The following Network Configuration Parameters must be
obtained from your Network Administrator before starting:

IP address

Subnet mask

Host name

Gateway IP address

Note: Host and Gateway are optional.

Advertising