Precautions, Tools/equipment required, Unpacking the galaxy gateway – GE Industrial Solutions Galaxy Vector Rack Mounted Controller J85501M-1 User Manual

Page 76: A - 6

Advertising
background image

Galaxy Rack-Mounted Vector Controller J85501M-1

Appendix A - 6 Communications

Issue 2 January 2008

Precautions

Note: Before starting, make sure proper ESD precautions are
observed. The ESD grounding termination point is located on
the left front of the unit.

• Wear grounded antistatic wrist straps when handling all

circuit packs. The wrist strap must be in contact with the skin
and is not to be worn over clothing.

• Always consider personal safety. Be aware of the presence of

battery potential in the vicinity of the controller.

• Use only insulated tools.

Verify that no controller related alarms are active on the LCD

display panel. If a controller alarm is active, review the product

manual troubleshooting section or contact Lineage Power

technical support.

Tools/Equipment

Required

Before installing and configuring the Galaxy Gateway, the
following tools/equipment are required:

• Flat jeweler’s screwdriver (controller DIP switch setting)

• Small #2 Phillips head screwdriver

• PC with terminal emulation program (example:

HyperTerminal)

• 9 pin male serial interface cable (DB-9 male) to connect to

Galaxy Gateway

• Network interface cable (CAT 5 UTP)

Unpacking the

Galaxy Gateway

The 848733898 Galaxy Gateway Kit has been inspected, tested
and carefully packed. Examine the shipping carton and all
components for any sign of shipping damage.

1. Check for external damage to the shipping cartons.

2. Remove all parts from shipping cartons.

3. Check the following table and verify that all components

are present.

Advertising