Vector controller configuration, A - 7 – GE Industrial Solutions Galaxy Vector Rack Mounted Controller J85501M-1 User Manual

Page 77

Advertising
background image

Item

Qty

Comcode

Description

1

1

108340100 Galaxy Gateway circuit pack

2

1

848281945 Black insulator (not used)

3

1

848364865 Millennium Controller interface cable (not used)

4

2

408456465 Nylon mounting posts (HMSP-TM-10)

5

1

402244081 Cable tie

6

2

407882141 Metal standoff (9740-SS-0632)

7

2

845143866 Screw, PPHM 6-32 x 5/16"

8

1

848589859 Black insulator

9

1

848575841 Vector Controller interface cable

10

4

408450955 Metal standoff (AL-5171-16)

11

8

901377366 Screw, PPHM M3 x 6mm

12

4

901351239 Nut, hex 6-32

13

1

848649943 Mounting bracket

Galaxy Rack-Mounted Vector Controller J85501M-1

Issue 2 January 2008

Communications Appendix A - 7

If damage is found and/or components are missing, file a claim
with the carrier if applicable, and notify Lineage Power
Customer Service (See Section 1).

Vector Controller

Configuration

The physical interface for the Vector controller to the Galaxy
Gateway is through P4 connector on the BUJ1 connection board,
close DIP switch S1.3 (set to 1) to allow communication
between Gateway and the Vector Controller.

Gateway

Installation for
the J85501M-1

Vector Controller

Use the following procedure and Figures A-4 and A-5 to install
a new or replacement Galaxy Gateway.

1. Place 848718276 black insulator under the Galaxy

Gateway and position over the mounting standoffs. J1 (RJ-
45 connection) should be pointing toward the middle of the
unit.

2. Install four 845143874 6-32 screws to the lower mounting

standoffs (torque to 3 in·lbs).

3. Install two 407882141 metal standoffs to the upper

mounting standoffs (torque to 10 in·lbs).

4. Wrap insulator around the Gateway board and snap onto

nylon posts. Using two 845143866 screws, secure top of
insulator to metal standoffs (torque to 10 in·lbs).

Advertising