c. The terminal cover has breakable teeth to let the wires feed through, break

the teeth as needed. Replace the terminal cover and secure in place.

d. Energize the AC main power input. The meter display will light up showing

the startup screens, then scroll through the following screens. Each display is

visible for 5 seconds.

Display screens are as follows:

Screen 1 - Total kilowatt-hours (kWh) consumed

Screen 2 - Peak demand (kW) with date & time stamp

Screen 3 - Present load (kW)

Screen 4 - Current (amps) per phase

Screen 5 - Voltage (volts) phase to neutral (for WYE service)

Screen 6 - Voltage (volts) phase to phase

Screen 7 - Power factor (PF) per phase

e. Verify the voltage readings using an AC voltmeter. Typical readings shown

below are measured phase to neutral for 4-wire and phase to phase for 3-

wire. Readings should be +/- 10% of nominal.

NOTE: For 3-Wire (Delta) systems, the voltages are measured Phase to Phase.

For 4-Wire (Wye) systems the voltages are measured Phase to Neutral.

Delta meters are powered by Phases A and B. Wye meters are powered

by Phase A to Neutral.

Meter Type

Nominal Voltage

Limits (+/- 10%)

120/208V, 3ø, 4 Wire

120/240V, 1ø, 3 Wire

127/220V, 1ø, 3 Wire

120V, 1ø, 2 Wire

120 VAC (L-N)

108 to 132 VAC

277/480V, 3ø, 4 Wire

277V, 1ø, 2 Wire

277 VAC (L-N)

249 to 305 VAC

240V, 3ø, 3 Wire

240 VAC (L-L)

216 to 264 VAC

400V, 3ø, 4 Wire

230 VAC (L-N)

207 to 253 VAC

480V, 3ø, 3 Wire

480 VAC (L-L)

432 to 528 VAC

600V, 3ø, 4 Wire

347 VAC (L-N)

312 to 380 VAC