2 meter rs-485 wiring, 3 usb key wiring – E-Mon E-D5-600800-S*SPL3-V3KIT3 User Manual

Page 30

Advertising
background image

DIN-MON™ SMART METER

62-0442—04

30

4.8.2 Meter RS-485 Wiring

1. Connect the + (high) terminal of each meter together so

that the + terminals on all meters are linked, + to +...

2. Connect the – (low) terminal of each meter together so

that the - terminals on all meters are linked, – to –...

3. Connect the SC (signal common) terminal of each meter

so that the SC terminals on all meters are linked, SC to

SC.

4. Install termination resistors (120 Ohm) at each end of the

daisy-chain cable run.

5. Connect the SH (shield) of each cable so that the SH on all cables are linked, SH

to SH. Terminate one end of SH to Earth ground. The SH should not be con-

nected to the meter.

NOTE: SC (signal common) is electrically connected to the isolated RS-485

digital ground of the meter. If there are devices on the network that do

not have SC terminal connection, skip over these devices. NEVER con-

nect SC to SH (shield).

4.8.3 USB Key Wiring

The USB Key allows you to connect Din-Mon™ meters to a personal computer that

has E-Mon Energy™ software installed. The USB key must be located within 15 feet of

the host computer.

Fig. 24. USB Key to RS-485 Network.

The USB Key plugs into the PC’s USB port and provides a termination point for the

RS-485 wiring from the meters. A termination is needed for the other end of the RS-

485 network. The USB Key is labeled + (plus), – (minus), “SC”; wiring must match the

same positions on the meters. Refer to RS-485 Wiring section for details. If more than

52 meters are to be monitored, additional USB Keys can be utilized to connect them to

the PC.

M35111

RS-485 TERMINAL

SC – +

PC WITH USB PORT

USB KEY

M35112

UP TO 52 METERS ON RS-485 NETWORK

UP TO 4000 FEET TOTAL CABLE LENGTH

TERMINATION

120 Ohm

TERMINATION

120 Ohm

Advertising