Rm sets a report channel, Xg sets the time zone – Yokogawa Button Operated MV2000 User Manual

Page 106

Advertising
background image

4-32

IM MV1000-17E

Example Set the report to none.

ROOFF

Description You can execute this command on models with

the /M1 math option.

To specify hourly, daily, hourly+daily, or

daily+monthly reports

Syntax

RO p1,p2,p3<terminator>
p1 Report type

HOUR

Hourly report

DAY

Daily report

HOUR+DAY Hourly and daily reports
DAY+MONTH Daily and monthly reports

p2 Date of generation (dd)

dd

Day (01 to 28)

p3 Time of generation (hh)

hh

Hour (00 to 23)

Query

RO?

Example Generate a daily report at hour 9 everyday

(parameter p2 (“05” in this example) is invalid in
this case).
RODAY,05,09

Description • You can execute this command on models

with the /M1 math option.

• Parameter p2 is discarded if it is specified for

reports other than monthly and daily reports.

To specify daily+weekly reports

Syntax

RO p1,p2,p3<terminator>
p1 Report type (DAY+WEEK)
p2 Day of generation (SUN, MON, TUE, WED,

THU, FRI, SAT)

p3 Time of generation (hh)

hh

Hour (00 to 23)

Query

RO?

Example Generate a daily report at hour 9 every day and

a weekly report at hour 9 every Tuesday.
RODAY+WEEK,TUE,09

Description You can execute this command on models with

the /M1 math option.

RM

Sets a report channel

To not use a report channel

Syntax

RM p1,p2<terminator>
p1 Report channel number
p2 Report channel ON/OFF (OFF)

Query

RM[ p1]?

Example Disable the channel 001 report channel.

RM001,OFF

Description • You can execute this command on models

with the /M1 math option.

• Set parameter p1 according to the table in

section 4.3.

To use a report channel

Syntax

RM p1,p2,p3,p4<terminator>
p1 Report channel number
p2 Report channel ON/OFF (ON)

p3 Measurement, computation, or external

input channel number to be reported

p4 Conversion of the time unit for TLOG.SUM

computation
OFF

No conversion.

/S

Convert as though the physical
values are integrated in units of
seconds.

/MIN

Convert as though the physical
values are integrated in units of
minutes.

/H

Convert as though the physical
values are integrated in units of
hours.

/DAY

Convert as though the physical
values are integrated in units of
days.

Query

RM[ p1]?

Example Use report channel number R01. Set the channel

number for generating reports to 001 and convert
the units of the summed value to seconds.
RMR01,ON,001,/S

Description • You can execute this command on models

with the /M1 math option.

• Set parameters p1 and p3 according to the

table in section 4.3.

• About p4
Because the sampled data is integrated

over each scan interval, the physical value
integrated over a given period may be different
from the actual integrated value. This occurs
if the given period is not equal to the scan
interval. In such case, set p4 to the same unit
as that of the physical value being measured.
The integrated value is found according to the
following converting equations that depend on
the parameter.

OFF Σ (measured value)
/S

Σ (measured value) × scan interval

/MIN Σ (measured value) × scan interval/60
/HOUR Σ (measured value) × scan

interval/3600

/DAY Σ (measured value) × scan

interval/86400

The scan interval unit is seconds.

XG

Sets the time zone

Syntax

XG p1,p2<terminator>
p1 Offset time from GMT (–1300 to 1300)

Upper 2 digits: Hour (00 to 13)

Lower 2 digits: Minute (00 to 59)

p2 Time deviation limit (OFF, 10S, 20S, 30S,

1MIN, 2MIN, 3MIN, 4MIN, 5MIN)

Example Set the offset time from the GMT to 9 hours

ahead and the deviation limit to 30 s.
XG0900,30S

4.6 Basic Setting Commands

Advertising
This manual is related to the following products: