Getting started, Mounting – Alicat MC Series Mass Flow Controller User Manual

Page 6

Advertising
background image

6

GETTING STARTED

Small Valve Mass Flow Controller shown with an upstream valve configuration and

connection port fittings

Large Valve Mass Flow Controller shown with a downstream valve configuration and

connection port fittings

MOUNTING

MC-Series Gas Flow Controllers have holes on the bottom for mounting to flat

panels. See pages 50- 70.
Small valve controllers (MC-Series) can usually be mounted in any position.
Large valve controllers (MCR-Series) should be mounted so that the valve

cylinder is vertical and upright. Mounting a large valve controller in another

position increases the risk of leakage when the controller is being held closed

by the spring force.
No straight runs of pipe are required upstream or downstream of the controller.

Inlet Connection Port

Outlet Connection Port

Control Valve

8 Pin MiniDIN

Display Screen

Inlet Connection Port

Flow Direction Arrow

Outlet Connection Port

Power Jack

Advertising