User's Guide ______________________________________________________________________

44 __________________________________________________________________ M211296EN-B

should be at the same height as the top of the finalized concrete
block. Protect the threads of the bolts above the orientation plate,
for example, by taping them. Also check the correct alignment of
the foundation assembly with the orientation plate. "N" should face
north and "S" should face south.

7.

For the guy wires, fix the foundation bolt (number 2 in Figure 10
on page 43) to the plate with a nut
(3). Fix the eye nut (1) to the
other end of the foundation bolt. Level the assembly so that the top
of the bolt will be 40 mm above the concrete in the finalized block.
The eye nut will then be one centimeter above the finalized
concrete block.

8.

Pour in the concrete. Finish the concrete block.

Using Existing Concrete Block

1.

Drill holes with a diameter of 25 mm into the concrete block using
the orientation plate as a guide. Make sure that the depth of the
holes is 240 mm (±5 mm).

0207-070

Figure 11

Accessories for Existing Concrete Block
Installation

2.

First, install the key piece (number 3 in Figure 11 above) correctly
inside the wedge bolt (4). The narrow end should point to the
direction of the lower arrow shown in Figure 11 above. Assemble
the wedge bolts into the holes. There are four bolts for the mast
base and one bolt for each of the guy wire blocks.

3.

Hammer the wedge bolts (4) down using the provided bar (2).

4.

Screw the foundation bolts (1) to the wedge bolts and tighten the
screws properly.

5.

Fill the remaining space of the holes with a suitable compound.

6.

Start erecting the mast after the compound is dry.