Vaisala AWS330 User Manual

Page 90

Advertising
background image

User's Guide ______________________________________________________________________

88 __________________________________________________________________ M211296EN-B

3.

Place the base of the rain gauge (9) onto the stand and level it with
the three leveling screws (2). Use the spirit level (13) on the rain
gauge for the leveling. Finally, secure the locknuts (12).

NOTE

Use the spirit level on the RG13(H) for the leveling (number 3 in Figure
46 on page 89).

4.

Secure the base through the two holding lugs (14) with the
provided Allen bolts, washers, and nuts (7, 8, and 10).

5.

Carefully remove the rubber band (11), which is fitted for transit
purposes, and check that the bucket pivots easily.

NOTE

Remember to remove the rubber band from inside the RG13(H) (number
11 in Figure 46 on page 89).

6.

Attach the outer tube of the rain gauge (1) onto the base and secure
it with the locks.

7.

Route the signal/power along the stand and secure it with cable ties
(15 and 16).

8.

Connect the signal/power cable to the Rain connector on the
bottom of the enclosure; see section Connecting Sensor Cables on
page 95.

The following numbers refer to Figure 46 on page 89:
1 = Outer tube of Rain Gauge RG13
2 = Leveling

screw

3 = Pedestal
4 = Nut M10 DIN934 A4, 4 pcs; use wrench 17 mm
5 = Washer A10 DIN125 A4, 4 pcs
6 = Wedge bolts; use a hammer
7 = Allen bolt M8x30 DIN912 A4, 2 pcs; Allen key 6 mm
8 = Washer A8 DIN125 A4, 2 pcs
9 = Base of Rain Gauge RG13
10 = Nut M8 DIN985 A4, 2 pcs; use wrench 13 mm
11 = Rubber band
12 = Locknut
13 = Spirit level
14 = Holding lugs, 2 pcs
15 = Cable
16 = Cable tie

Advertising