Mechanical installation procedure – Vaisala AWS330 User Manual

Page 47

Advertising
background image

Chapter 4 _______________________________________________________________ Installation

VAISALA _______________________________________________________________________ 45

Mechanical Installation Procedure

Reserve at least a full day for the mechanical installation, especially if
you do not have previous experience with weather stations.

CAUTION

Wear a safety helmet when installing the mast. Preferably do not install
the mast alone.

The mechanical installation consists of the following phases:

1.

Installing Mast DKP210 as described on page 46.

2.

Installing Ultrasonic Wind Sensor WMT70 as described on page 62
or Installing Mechanical Wind Sensor Set WA15 as described on
page 70.

3.

Installing GSM/GPRS Antenna as described on page 72.

4.

Installing Solar Panel as described on page 73.

5.

Erecting Mast DKP210 as described on page 56.

6.

Installing Sensor Support as described on page 77.

7.

Installing Air Temperature and Relative Humidity Probe HMP155
as described on page 80.

8.

Installing Snow Depth Sensor IRU-9429 as described on page 85.

9.

Installing Pyranometer CMP6 as described on page 82.

10. Installing Soil Temperature Sensor QMT110 as described on page

86.

11. Installing Rain Gauge RG13(H) as described on page 87.
12. Installing Enclosure as described on page 90, comprising the

following phases:
a.

Installing Enclosure to Mast as described on page 91 or
Installing Enclosure to Wall as described on page 93.

b.

Grounding Enclosure as described on page 94.

c.

Preparing GSM/GPRS Modem as described on page 94

13. Connecting Sensor Cables as described on page 95.
14. Powering Up System as described on page 97.

After the mechanical installation, AWS330 is configured with a laptop
PC and AWS Client software as described in Chapter 5, Software
Configuration and Operation, on page 103.

Advertising