Wiring the remote/secondary controller – Elkhart Brass Unibody Valve User Manual

Page 69

Advertising
background image

69

800.346.0250 • www.elkhartbrass.com

GENERAL WIRING DIAGRAM (UBEC1, UBEC2, UBEC3 and UICS2)

1. Controller harness
2. Sensor/solenoid harness

a. Pressure only (UBEC2 only)

b. Pressure and flow (UBEC3 only)

c. Pressure and air solenoid (UICS2 only)

3. Pressure sensor
4. Flow sensor or air solenoid
5. Secondary controller harness (Datalink)

Figure 49. General Wiring Diagram (UBEC1, UBEC2, UBEC3 and UICS2)

Wiring the Remote/Secondary Controller

The Datalink terminals of the secondary controller harness must be field installed into the appropriate pin

positions of the 12-pin connector of the primary controller harness.
1. Remove the rubber debris plugs from positions 11 and 12 of the primary controller harness

12-pin connector.

2. Note the wire colors corresponding to pin positions 11 and 12 on the secondary controller harness

12-pin connector.

3. Insert the Datalink terminals into their respective positions in the primary controller harness

12-pin connector.

Note: Push gently on the terminal until it “clicks” into housing.

Primary

Controller

Remote/Secondary

Controller

3

4

2

1

5

Primary

Controller

Remote Secondary

Controller

Advertising