The Cornet must be installed in a suitable environment and properly connected to its voltage
supplies and the motor.

1.10. Before You Begin

1.10.1. Site Requirements

You can guarantee the safe operation of the Cornet by ensuring that it is installed in an
appropriate environment.

Feature

Value

Ambient operating temperature

0 °C to 40 °C (32 °F to 104 °F)

Maximum Operating Altitude

2,000 m (6562 feet)

Maximum relative humidity

90% non-condensing

Operating area atmosphere

No flammable gases or vapors permitted in area

Models for extended environmental conditions are available.

Caution:

The Cornet dissipates its heat by forced ventilation (fan). The maximum operating

ambient temperature of 0 °C to 40 °C (32 °F to 104 °F) must not be exceeded.

1.10.2. Hardware Requirements

The components that you will need to install your Cornet are in this section.

1.10.2.1.

AC Input Requirements

Circuit Breakers &
Contacts

Three-Phase Supply
Voltage

Single-Phase Supply
Voltage

Circuit breaker current rating

150% to 200% of drive current 200% to 300% of drive current

Circuit breaker voltage rating

480 VAC

480 VAC

Contactor

Up to 150% of drive current

Up to 200% of drive current