Powering up, Initializing the system, Powering up 1.15. initializing the system – ElmoMC AC Input Digital Servo Drives-Bassoon Cable Kit User Manual

Page 54

Advertising
background image

Cornet Installation Guide

Installation

MAN-CORIG (Ver. 1.502)

www.elmomc.com

54

1.14. Powering Up

After the Cornet has been mounted, check that the cables are intact. The Cornet servo drive is
then ready to be powered up.

Caution:

Before applying power, ensure that the AC supply is within the range specified

for your specific type of Cornet.

1.15. Initializing the System

After the Cornet has been connected and mounted, the system must be set up and initialized.
This is accomplished using the Composer, Elmo’s Windows-based software application. Install
the application and then perform setup and initialization according to the directions in the
Composer Software Manual.

Advertising