‎Chapter 7 Programming the PM180

Basic Device Setup

PM180 Substation Automation Unit

61

Basic Device Setup

Before operating your device, define the basic information about your electrical
network.
To enter the setup dialog, select the device site from the list box on the PAS toolbar,
and then select General Setup from the Meter Setup menu.

The following table lists available device configuration options.

Option

Range

Default

Description

Basic Configuration

Wiring connection mode
(configuration)

See “Wiring
Connections”
below

4LN3

The wiring connection of the device

PT ratio

1

V1-V3 voltage inputs

1.0 - 6500.0

1.0

The phase potential transformer ratio
(primary to secondary ratio)

PT secondary (L-L), V

10-690 V

120

The phase potential transformer’s
secondary phase-to-phase voltage

V4 PT ratio

1

1.0 - 6500.0

1.0

The V4 potential transformer ratio (primary
to secondary ratio)

V4 PT secondary, V

10-690 V

120

The V4 potential transformer’s secondary
voltage

CT primary, A

I1-I3 current

2

inputs

1-10000 A

5

The primary rating of the phase current
transformer on standard (20A/10A) inputs

I4 CT primary, A

current

1-10000 A

5

The primary rating of the I4 current
transformer on standard (20A/10A) inputs

I4 CT secondary current

1, 5 A

5

The secondary rating of the I4 current
transformer on standard (20A/10A) inputs

Nominal frequency, Hz

50, 60 Hz

50 (60 for North
America)

The nominal power frequency

Phase order

ABC, CBA

ABC

The normal phase sequence

Demand Setup

Power Block demand
period, min

1, 2, 5, 10, 15,
20, 30, 60

15

The length of the demand period for power
demand calculations

Number of Blocks in
sliding window

1-15

1

The number of demand periods to be
averaged for sliding window demands