Din rail mounting – Rockwell Automation 1440-TPR06-00RE XM-360 Process Module User Manual

Page 22

Advertising
background image

Publication GMSI10-UM006C-EN-P - August 2010

14 Installing the XM-360 Process Module

DIN Rail Mounting

Use the steps below to mount the XM-944 terminal base unit on a DIN rail
(A-B pt no. 199-DR1 or 199-DR4).

1. Position the terminal base on the 35 x 7.5mm DIN rail (A).

2. Slide the terminal base unit over leaving room for the side

connector (B).

3. Rotate the terminal base onto the DIN rail with the top of the rail

hooked under the lip on the rear of the terminal base.

Position terminal base at a slight angle and hook over the top of the DIN rail.

Advertising