3 installation, 1 about this chapter, 2 initial installation – Metrohm 881 Compact IC pro – Anion – MCS User Manual

Page 20: About this chapter, Initial installation

Advertising
background image

3.1 About this chapter

■■■■■■■■■■■■■■■■■■■■■■

10

■■■■■■■■

881 Compact IC pro – Anion – MCS

3 Installation

3.1

About this chapter

The Installation chapter contains

this overview.

a brief set of instructions for the initial installation of the 881 Compact
IC pro – Anion – MCS. At each step you will find cross-references to
more detailed installation instructions for individual components,
should you require such aids.

an installation diagram (see Chapter 3.3, page 14), showing a com-
pletely installed 881 Compact IC pro – Anion – MCS.

several chapters with detailed installation instructions for all compo-
nents, including those that are already installed at the time the instru-
ment is delivered.

3.2

Initial installation

Note

A number of the capillaries is already connected at the time the instru-
ment is delivered.

The following work steps must still be carried out:

881 Compact IC proInstalling – Anion – MCS

1 Setting up the instrument

(see Chapter 3.4, page 17).

2 Installations on the rear of the instrument

Place the detector in the instrument and connect it (see manual
of the detector)
.

Remove all of the transport locking screws with the 4 mm hexa-
gon key (6.2621.030) and keep them in a safe place.

Connect the leak sensor (see Chapter 3.6.2, page 20).

Connect the drainage tubings (see Chapter 3.6.3, page 21).

Advertising