Metrohm 881 Compact IC pro – Anion – MCS User Manual

Page 21

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

3 Installation

881 Compact IC pro – Anion – MCS

■■■■■■■■

11

3 Connecting the eluent path

Lead the eluent aspiration tubing (6.1834.080) out of the instru-
ment through a capillary feed-through and connect it with the
eluent bottle (see Chapter 3.8.1, page 25).

Connect the column inlet capillary (6.1831.100) and the capillary
of the MSM labeled with in to one another with a coupling
(6.2744.040) and two short pressure screws (6.2744.070).

Use a long pressure screw (6.2744.090) to connect the capillary
of the MSM labeled with out to the input of the of the MCS (see
"Connecting the MCS", page 55)
.

Connect the detector inlet capillary with a long pressure screw
(6.2744.090) to the output of the MCS (see "Connecting the
MCS", page 55)
.

4 Connecting the sample path

Note

The sample degasser does not have to be connected. We recom-
mend the usage of the sample degasser only if the sample matrix
requires it (see Chapter 3.13, page 37).

Guide the sample aspiration capillary connected to the sample
input of the injection valve out of the instrument through a capil-
lary feed-through and connect it with the Sample Processor, if
applicable (see Sample Processor manual)..

Guide the sample outlet capillary connected to the sample output
of the injection valve out of the instrument through a capillary
feed-through and onward to the waste container and then fasten
it there.

5 Installing the peristaltic pump

(see Chapter 3.16.2, page 47)

Prepare the pump tubing for the regeneration solution:

Plug a tubing olive (6.2744.034) onto one end of the pump tub-
ing (6.1826.320).
Plug a pump tubing connection (6.2744.180) onto the other end
of the pump tubing.

Advertising