ADS Environmental Services RainAlert II QR 775008 A2 User Manual

Page 137

Advertising
background image

In-6

ADS RainAlert II Manual

configuring the power savings

parameters, 5-19

editing the notification device, 5-9
editing the rain device, 5-8
editing the RSSI device, 5-11
launching software, 5-2
running diagnostics on rain

device, 5-24

selecting and editing devices, 5-6
setting communication parameters,

5-12

upgrading the monitor firmware,

5-35

viewing logs, 5-38

R

rain device

editing, 5-8
running diagnostics, 5-24

rain measurement

calibrating the tipping bucket,

3-11

installing the tipping bucket, 3-7
tipping bucket, 2-9

remote communication

setting up land line

communication, 4-14

setting up wireless

communication, 4-2

replacing the battery pack, 6-5
RSSI device

editing, 5-11

running diagnostics, 5-24

S

setting communication parameters,

5-12

signal strength, 5-12

editing the RSSI device, 5-11

SIM (Subscriber Identity Module),

4-2

SIM card installation, 4-9
site investigation, 3-3
slim antenna

installation, 4-4

specifications, A-1

board, A-3
external wireless antennas, B-1
lightning protection module, A-5
monitor, A-1
tipping bucket, A-4

static IP address, 4-2
Subscriber Identity Module (SIM),

4-2

sun shield

mounting the tipping bucket, 3-8
part number, B-1

T

TCP/IP, 5-12
telephone cable

preparing for connection, 4-17
running between monitor and

service locations, 4-15

wiring lightning protection

module to network interface
box, 4-23

wiring to lightning protection

module, 4-21

wiring to monitor, 4-19

telephone service, 4-14

installation, 4-14

connecting ground wires, 4-23
mounting lightning protection

module, 4-16

preparing the telephone cable,

4-17

running cable between the

monitor and service
locations, 4-15

verifying grounding, 4-16
wiring lightning protection

module to network interface
box, 4-23

Advertising