ADS Environmental Services RainAlert II QR 775008 A2 User Manual

Page 31

Advertising
background image

3-10

ADS RainAlert II Manual

Securing the sun shield to the base plate

2. Place the entire assembly in the rainfall collection location.

3. Verify the tipping bucket is level in the following way:

 Remove the funnel from the bucket.

 Check the level according to both the X-axis and the Y-

axis using the integrated levels located inside the tipping
bucket or by placing a carpenter’s level over the top of the
bucket.

 Adjust the three mounting feet on the base plate as

necessary to ensure the tipping bucket is level.

4. Replace the funnel and pre-wet it.

5. Calibrate the tipping bucket to verify the tipping mechanism is

in adjustment. Refer to Calibrating the Tipping Bucket on
page 3-11 for more information.