C h a p t e r 5 configuration and activation, Configuration and activation – ADS Environmental Services RainAlert II QR 775008 A2 User Manual

Page 68

Advertising
background image

5-1

C H A P T E R 5

Configuration and Activation

After installing the ADS

®

RainAlert II

monitor and tipping bucket

and setting up communication, it is necessary to configure and
activate the monitor to begin recording rain data. This chapter
contains general instructions on the following activities concerning
monitor configuration and activation:

Creating a monitor location

Selecting and editing devices

Setting the communication parameters

Activating the monitor

Configuring power savings (optional)

This chapter also includes the procedure for running diagnostics on
the rain device, collecting data from the monitor, and upgrading the
firmware (embedded software) in the monitor.

Refer to the Profile User's Guide (#950015**) for more detailed
instructions on installing the software, collecting monitor data, and
configuring, activating, and confirming the monitor.

Advertising