ADS Environmental Services RainAlert II QR 775008 A2 User Manual

Page 23

Advertising
background image

3-2

ADS RainAlert II Manual

Calibrate the Tipping Bucket This process involves
testing and adjusting the tipping bucket and internal tipping
mechanism to ensure it accurately measures rainfall amounts.

Install the Monitor This step involves securing the monitor
to a wall independent from the tipping bucket or locating it on
the base plate at the rainfall collection location.

Connect the Tipping Bucket to the Monitor This
process involves running and connecting the cable between the
tipping bucket and the monitor.

This chapter contains instructions for properly installing a
RainAlert II monitor and tipping bucket.

Note: Installation may require using ladders to access
rooftops and other elevated areas. Therefore, installers
and technicians must comply with all federal, state,
municipal, and building owner safety regulations when
installing this equipment. ADS is not responsible for any
injuries, damages, claims, or liability resulting directly or
indirectly from the use of this installation guide or the
installation of any ADS equipment.

Advertising