5 slot assignments, 6 enclosure reassembly, 7 cpu board removal – Rice Lake 820i Programmable Indicator/Controller - Installation Manual User Manual

Page 14: Slot assignments, Enclosure reassembly, Cpu board removal, Section

Advertising
background image

10

820i

Installation Manual

2.5

Slot Assignments

Table 2-4 lists the slot numbers, CPU board connectors, and configuration assignments made for both onboard

and expansion card functions in the

820i

. See Figure

2-3 for connector locations.

Table 2-4. 820i Slot Assignments

Slot Number

Connector

Function

Configured As

0

Connector J5

Onboard digital I/O

Slot 0, bits 1–8

Connectors J9, J1, J10, J11

Onboard serial communications

Ports 1–4

1

Connectors J7, J8

Onboard single- or dual-channel A/D

Channel 1, Channel 2

2

Connector J6 (option card slot)

Dual-channel serial expansion card

Ports 7–8

Digital I/O expansion card

Slot 2, bits 1–24

Analog input card

Slot 2, channels 1–2

Analog output card

Analog 2

Pulse input card

Pulse 2

Memory expansion card

Memory 2

Bus communications cards

Bus Option 2

2.6

Enclosure Reassembly

Once cabling is complete, position the backplate over

the enclosure and reinstall the backplate screws. Use

the torque pattern shown in Figure 2-4 to prevent

distorting the backplate gasket. Torque screws to 15

in-lb (1.7 N-m).

1

3

5

14

17

16 12

9

8

7

10

11

18

15

4

2

6

13

T o r q u e b a c k p l a t e s c r e w s

t o 1 5 i n - l b ( 1 . 7 N - m )

Figure 2-4. 820i Enclosure Backplate

Torqued screws may become less tight as the gasket is
compressed during torque pattern, therefore a second
torque is required using the same pattern and torque
value.

2.7

CPU Board Removal

If you must remove the

820i

CPU board, use the

following procedure:

1. Disconnect power to the indicator. Remove

backplate as described in Section 2.2 on

page

6.

2. Unplug connectors for power to the board,

serial communications, digital I/O, and any

installed option cards.

3. Remove any installed option cards.
4. Remove the five phillips head screws and two

kep nuts from the CPU board.

5. Gently lift up the CPU board, then disconnect

bottom-side connectors for power to display,

ribbon cable, and keypad connector.

6. Remove CPU board from the enclosure. If

necessary, cut cable ties to shift cables out of

the way.

To replace the CPU board, reverse the above

procedure. Be sure to reinstall cable ties to secure all

cables inside the indicator enclosure.

Advertising