TOSHIBA

6 F 8 A 0 7 7 4

4,2,2

Installation Procedure

The LF4y4/LF404 adopis the ISO ^^^52 ditmp connection mcihcnJ-

To mount the 1.F494/LF404, see Figure 4.2 and follow the procedure below;

1. Weld a ferrule of the detector to the proces.s pipe on both upstream and downstream

sides.

2 .

Install the LJ’494/LI-404 between the two tcrrulcs w'hicli were welded to the pnjcess

pipes above.

3 .

InstaU a gasket betw^een ;he grooves of theferruJeon the detector side and lhal of the

ferrule on the process pipe for both upstream and dow^nslream sides,

1

iicn place a

clamp over the joined ferrules as shown in I’igure 4,2 and tigliien with the screw' for

both upstream and downstream process pipes._______________________________

IMPORTANT

When high-temperature fluid is being nieasuredj radiant heal from ihe detector pipe surface and

adjoining pipes may cause the ambient temperature of the converter to go above 60

° C .

If the

ambient tempera lure goes above 60^ C, (ry to lower the temperature by measures such as wrap­

ping hcal-insulating materials over the detector pipe and adjoining pipes.

-