4 transport and storage, 1 testing upon acceptance, 2 packaging / return transport – KERN & SOHN DBS 60-3 User Manual

Page 21: 5 unpacking, setup and commissioning, 1 installation site, location of use

Advertising
background image

DBS-BA-e-1311

21

4 Transport and storage

4.1 Testing upon acceptance

When receiving the appliance, please check packaging immediately, and the
appliance itself when unpacking for possible visible damage.

4.2 Packaging / return transport

 Keep all parts of the original packaging for a possibly

required return.

 Only use original packaging for returning.

 Prior to dispatch disconnect all cables and remove

loose/mobile parts.

 Reattach possibly supplied transport securing devices.

 Secure all parts such as the glass wind screen, the

weighing platform, power unit etc. against shifting and
damage.


5 Unpacking, Setup and Commissioning

5.1 Installation Site, Location of Use

The unit is designed to achieve reliable weighing results under normal conditions of
use.
You will work accurately and fast, if you select the right location for the appliance.

Advertising