7 mains connection, 8 storage battery operation (optional) – KERN & SOHN FA 6T-3M User Manual

Page 14

Advertising
background image

14

KFB/KFN-TM-BA_IA-e-1220

6.7 Mains connection
Power is supplied via the external mains adapter. The stated voltage value must be

the same as the local voltage.

Only use original KERN mains adapters. Using other makes requires consent by

KERN.

6.8 Storage battery operation (optional)
Before the first use, the battery should be charged by connecting it to the mains

power supply for at least 12 hours.
If the weight display shows

, this is an indication that the capacity of the

rechargeable battery is almost exhausted. The unit will be ready for operation for

approx. another 10 hours before switching off automatically. Charge the battery with

the help of the supplied power pack.

The LED display informs you during loading about the loading status of the

rechargeable battery.

red:

Voltage has dropped below prescribed minimum.

green:

Battery is completely discharged

yellow:

Charging storage battery

To conserve energy, enable the automatic switch-off function „AUTO OFF“, see

chap. 7.14.

Advertising
This manual is related to the following products: