Switch Delay

Adjustable from 0.0 to 12.0 Hours

Default: 0.5 hours

Button: MENU/<System Startup>/..../Switch Setpoint/Switch Diff/Switch Delay

• The Switch Delay is an additional layer of assurance used to reduce the intermittent change

of the lead group.

• To switch the lead group when the temperature is dropping, the sensor temperature must

remain below the Switch Set Point less the Switch Differential for the complete Switch

Delay period before the switching of the lead group.

• I.e., if the Switch Set Point was set to 135ºF, and the Switch Differential was set to 5ºF, then

the Target Temperature must drop below 130ºF for the complete Switch Delay for the lead

group to change from Condensing to Non-Condensing.

• To switch the lead group when the temperature is rising, the Target Temperature must rise

above the Switch Set Point for the complete Switch Delay before the switching of the lead

group could take effect.

--- SWITCH DELAY ---

0.5

Hour

[

]

BACK ▲ ▼ SAVE

Heavy Load Sequence 2nd group

Yes, No

Default: No

Button: MENU/<System Startup>/..../Switch Delay/Heavy Load Seq#2 Group

• This option makes the second group of boilers act as a backup in heavy load conditions.

Thus, allowing them to start after all lead group boilers have run at their maximum capacity.

• If the system was designed to operate both groups of boilers in heavy load conditions, then

select Yes.

• Selecting No will only allow the lead group to operate. The secondary group will remain off

even if the system cannot reach the desired set point.

HEAVY LOAD

-SEQUENCE #2 GROUP-

No

Yes

BACK ▲ ▼ SAVE

Condensing and Non-Condensing Boiler Type

Modulating, Staging

Default: Modulating

Button: MENU/<System Startup>/..../Heavy Load Seq#2 Group/Condensing Boiler Type

• Select the appropriate boiler type from the list. Each of the types will be followed by a

related additional configuration settings to adjust.

CONDENSING

---- BOILER TYPE ----

Modulating

Staging

BACK ▲ ▼ SAVE

Condensing and Non-Condensing Boiler Number

Adjustable from 1 to 15

Default: 1

Button: MENU/<System Startup>/..../Condensing Boiler Type/ Condensing Boiler Number

• Select the number of condensing boilers. These boilers will occupy the first letters of the

wiring stages on the M4-LHS starting with Stage-A.

Then, select the number of non-condensing boilers later in the Startup menu. See "HYBRID

Startup Menu" on page 17.

• Note that, each Multi-Stage boiler requires the use of single output stage relay.

CONDENSING

-- BOILER NUMBER --